1. Assignment:
- Development Support for the Water Use Master Plan (WUMP) Batch II (Package #1: Geruwa RM, Thakurbaba RM and Rajapur Municipality in Bardiya and Package #4: Panchapuri Municipality, Barahatal RM in Surkhet, and Panchadewal Binayak Municipality in Achham District.)
- Development Partner – USAID/ DAI – Karnali Water Activity
- Assigned Period – 15 March – 30 September 2023
2. Assignment:
-Technical Support for MWASH Plan Development for Chure Rural Municipality, Kailali.
-Client – Chure Rural Municipality, kailali
- Assigned Period – January – September 2023
3. Assignment:
- Conducting detailed engineering surveys, Design, and Cost estimation of the rural Community Water Supply System of Chaapdada WSS, Chauki Dada WSS, Dahakhani WSS, Mayatar Dumkin WSS and Simatar-Peepaltar WSS in Icchakamana Rural Municipality of Chitwan District.
-Client – Wine to Water Nepal
- Assigned Period – 28 April - 31 May 2023
4. Assignment:
-Development Support for the Water Use Master Plan (WUMP) Batch I (Packages # 2, Madhuwan Municipality in Bardiya and Khand chakra Municipality in Kalikot District and Package # 6, Athbiskot Municipality in Dailekh and Chaukane Municipality in Surkhet District.)
- Development Partner – USAID/ DAI – Karnali Water Activity
- Assigned Period – July – December 2022
5. Assignment:
-Baseline Survey in Selected Palikas of Karnali Province to Establish Benchmarks for Sustainable WASH for ALL (SuSWA) Project Working Areas.
-Development Partner – SUSWA/NIRAS Finland
-Assigned Period – February - March 2022
6. Assignment:
-Survey, Design, and Cost Estimate of Pangra Khola Solar Lift Drinking Water Supply Scheme of Sigas RM, Baitadi
-Client – Sigas Rural Municipality, Baitadi
-Assigned Period – Jan – Jul 2022
7. Assignment:
-Technical Support for MWASH Plan Development for Thalara Rural Municipality, Bajhang.
-Client – Thalara Rural Municipality, Bajhang.
- Assigned Period – Mar – Jun 2022
8. Assignment:
-Technical Support for MWASH Plan Development for Talkot Rural Municipality, Bajhang.
-Client – Talkot Rural Municipality, Bajhang.
- Assigned Period – Mar – Jun 2022
9. Assignment:
Technical Support for MWASH Plan Development for Chhabispathivera Rural Municipality, Bajhang.
-Client – Chhabispathivera Rural Municipality, Bajhang.
- Assigned Period – Mar – Jun 2022
10. Assignment:
-Preparation of District Profile and Periodic District Development Plan.
-Client – District Development Committee, Rasuwa
- Assigned Period – Jan – Oct 2015
11. Assignment:
-Needs Survey, Project Formulation, and Socioeconomic survey for post-earthquake.
-Development Partner – JICA Nepal Office, Kathmandu
- Assigned Period – May – Aug 2015
12. Assignment:
-TA 8346 NEP: Third Small Towns Water Supply and Sanitation Project – 1 (35173-012)
-Development Partner - GHK Consulting Ltd/ADB (Association)
-Assigned Period – Sept-Dec 2014
13. Assignment:
-Preparation of Five-Year DEDSP of Jumla and Kapilbastu District
-Client - MEDEP
-Assigned Period - Jun - Aug 2014
14. Assignment:
-Performance Evaluation of the Implementing Agencies of MEDEP
-Client - UNDP
-Assigned Period - Nov - Dec 2014
15. Assignment:
-Final Evaluation of the SAFER Project and its Impact on the Political Economy.
-Client - Practical Action
-Assigned Period - Nov - Dec 2014
16. Assignment:
-Impact Study on Empowerment of Women, Dalits, Indigenous Nationalities and Other Hard Core.
-Client - MEDEP/UNDP
-Assigned Period - Jun - Aug 2014
17. Assignment:
-Final Evaluation of Raising Opportunities for Jobs in Gramin Areas for Rural Income (ROJGARI)
-Client - Practical Action
-Assigned Period - May - Jul 2014
18. Assignment:
-Baseline Survey (in April) and Impact Assessment (in December): Vegetable Subsector
-Client - SAMARTHI/NMDP
-Assigned Period - Feb - Nov 2014
19. Assignment:
-Strengthening the Capacity of the Department of National Parks and Wildlife Conservation (DNPWC) for the Effecting Management of Mountain Protected Areas and Development of 5 Management Plans
-Client - Project Coordination Unit/National Trust for Nature Conservation (NTNC)
-Assignment Period - Dec 2012 - Mar 2014
20. Assignment:
-Performance Evaluation of the Implementing Agencies of MEDEP.
-Clint: MEDEP/UNDP
-Assigned Period: Nov - Dec 2013
21. Assignment:
-Post–training (Technical and Vocational Training Centre: TVTC) Assessment of Rural Youths of Achham, Doti and Kailali Districts.
-Client: Practical Action
-Assigned Period: Sept - Dec 2013
22. Assignment:
-Support for policy formulation for Federal Forestry Structure and Mechanism
Client: Multi-Stakeholder Forestry Program (MSFP) / MoFSC
Assigned Period: Jul - Sept 2013
23. Assignment:
-Conduct a Survey on Road Traffic Accident and Road Safety in Nepal.
Client: Ministry of Health and Population (MoHP), Kathmandu.
Assigned Period: May to Jul 2013
24. Assignment:
Evaluation of Implementing Partners on their Results Achieved
Client: Area Program Service Office (APSO), Surkeht / MEDEP-III.
Assigned Period: Nov to Dec 2012